The State Highway 78 and Avenue F bridges over Duck Creek also included some architectural treatments. The ashlar finish on the prestressed concrete panels in the drilled shaft soldier pile retaining walls combined with the TxDot C411 Classic Combination Bridge Railing lend an antique look to this bridge and channelization project adjacent to historic Central Park in Garland, Texas. This project was designed for the City of Garland and the Texas Department of Transportation and required close coordination with the U.S. Army Corps of Engineers for integration into their Duck Creek Channelization project.